Economic production quantity model with defective items, imperfect rework process, and lost sales

Authors

DOI:

https://doi.org/10.30656/jsmi.v8i1.7580

Keywords:

Defective items, Economic production quantity, Imperfect rework process, Inventory management, Lost sales, Production lot size

Abstract

This study proposes an economic production quantity (EPQ) model that comprehensively addresses scrap items, imperfect quality items, rework processes, and shortages. The model incorporates various types of defective items, including scrap, imperfect quality, and rework able items, and implements immediate rework processes upon the completion of regular production. Shortages are treated as lost sales, enhancing the accuracy of inventory cost estimations. Numerical experiments demonstrate the opti­mal­ity of production lot sizes and underscore the impact of production and demand rate adjustments on overall inventory costs. Sensitivity analysis further elucidates the influence of imperfect quality items on inventory costs. This EPQ model offers a comprehensive approach to efficient and effective finished product inventory management by integrating consider­ations for scrap items, imperfect quality items, and rework processes. Addi­tionally, a furniture manufacturing company case is presented to illustrate the practical application of the proposed model.

Downloads

Download data is not yet available.

References

L.-F. Hsu and J.-T. Hsu, ‘Economic production quantity (EPQ) models under an imperfect production process with shortages backordered’, Int. J. Syst. Sci., vol. 47, no. 4, pp. 852–867, Mar. 2016, doi: https://doi.org/10.1080/00207721.2014.906768.

S. H. R. Pasandideh, S. T. A. Niaki, A. H. Nobil, and L. E. Cárdenas-Barrón, ‘A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost’, Int. J. Prod. Econ., vol. 169, pp. 203–214, 2015, doi: https://doi.org/10.1016/j.ijpe.2015.08.004.

A. A. Taleizadeh, H.-M. Wee, and S. G. Jalali-Naini, ‘Economic production quantity model with repair failure and limited capacity’, Appl. Math. Model., vol. 37, no. 5, pp. 2765–2774, 2013, doi: https://doi.org/10.1016/j.apm.2012.06.006.

H. Mokhtari, ‘A joint internal production and external supplier order lot size optimization under defective manufacturing and rework’, Int. J. Adv. Manuf. Technol., vol. 95, no. 1, pp. 1039–1058, 2018, doi: https://doi.org/10.1007/s00170-017-1290-1.

L. Moussawi-Haidar, M. Salameh, and W. Nasr, ‘Production lot sizing with quality screening and rework’, Appl. Math. Model., vol. 40, no. 4, pp. 3242–3256, 2016, doi: https://doi.org/10.1016/j.apm.2015.09.095.

A. H. Tai, ‘Economic production quantity models for deteriorating/imperfect products and service with rework’, Comput. Ind. Eng., vol. 66, no. 4, pp. 879–888, 2013, doi: https://doi.org/10.1016/j.cie.2013.09.007.

A. H. Nobil and A. A. Taleizadeh, ‘A single machine EPQ inventory model for a multi-product imperfect production system with rework process and auction’, Int. J. Adv. Logist., vol. 5, no. 3–4, pp. 141–152, Nov. 2016, doi: https://doi.org/10.1080/2287108X.2016.1207975.

S. S. Kalantari and A. A. Taleizadeh, ‘Mathematical modelling for determining the replenishment policy for deteriorating items in an EPQ model with multiple shipments’, Int. J. Syst. Sci. Oper. Logist., vol. 7, no. 2, pp. 164–171, Apr. 2020, doi: https://doi.org/10.1080/23302674.2018.1542753.

A. Gharaei, S. A. Hoseini Shekarabi, and M. Karimi, ‘Modelling And optimal lot-sizing of the replenishments in constrained, multi-product and bi-objective EPQ models with defective products: Generalised Cross Decomposition’, Int. J. Syst. Sci. Oper. Logist., vol. 7, no. 3, pp. 262–274, Jul. 2020, doi: https://doi.org/10.1080/23302674.2019.1574364.

H. Öztürk, ‘A deterministic production inventory model with defective items, imperfect rework process and shortages backordered’, Int. J. Oper. Res., vol. 39, no. 2, pp. 237–261, 2020, doi: https://doi.org/10.1504/IJOR.2020.109756.

Y.-H. Lin, Y.-C. Chen, and W.-Y. Wang, ‘Optimal production model for imperfect process with imperfect maintenance, minimal repair and rework’, Int. J. Syst. Sci. Oper. Logist., vol. 4, no. 3, pp. 229–240, Jul. 2017, doi: https://doi.org/10.1080/23302674.2016.1160452.

G. Viji and K. Karthikeyan, ‘An economic production quantity model for three levels of production with Weibull distribution deterioration and shortage’, Ain Shams Eng. J., vol. 9, no. 4, pp. 1481–1487, 2018, doi: https://doi.org/10.1016/j.asej.2016.10.006.

S. Ganesan and R. Uthayakumar, ‘EPQ models for an imperfect manufacturing system considering warm-up production run, shortages during hybrid maintenance period and partial backordering’, Adv. Ind. Manuf. Eng., vol. 1, p. 100005, 2020, doi: https://doi.org/10.1016/j.aime.2020.100005.

M. Najafi, A. Ghodratnama, and H. R. Pasandideh, ‘Solving a deterministic multi product single machine EPQ model withpartial backordering, scrapped products and rework’, Int. J. Supply Oper. Manag., vol. 5, no. 1, pp. 11–27, 2018, https://doi.org/10.22034/2018.1.2.

E. A. Silver, D. F. Pyke, and D. J. Thomas, Inventory and production management in supply chains. CRC press, 2016, [Online]. Available: https://books.google.co.id/books?id=uY2ODwAAQBAJ.

R. J. Tersine, Principles of Inventory and Materials Management. Prentice Hall, 1993, [Online]. Available: https://books.google.co.id/books?id=wCkfAQAAIAAJ.

G. Hadley and T. M. Whitin, Analysis of Inventory Systems. Prentice-Hall, 1963, [Online]. Available: https://books.google.co.id/books?id=TZk8AAAAIAAJ.

E. W. Taft, ‘The most economical production lot’, Iron Age, vol. 101, no. 18, pp. 1410–1412, 1918.

Y.-S. P. Chiu, C.-A. K. Lin, H.-H. Chang, and V. Chiu, ‘Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance’, Math. Comput. Model. Dyn. Syst., vol. 16, no. 4, pp. 373–388, Nov. 2010, doi: https://doi.org/10.1080/13873954.2010.511199.

R. H. Ballou, Instructor’s Manual Business Logistics Management: Planning and Control. Prentice-Hall, 1985, [Online]. Available: https://books.google.co.id/books?id=XewmtwAACAAJ.

K. Kostić, ‘Inventory control as a discrete system control for the fixed-order quantity system’, Appl. Math. Model., vol. 33, no. 11, pp. 4201–4214, 2009, doi: https://doi.org/10.1016/j.apm.2009.03.004.

H. M. Wee, J. Yu, and M. C. Chen, ‘Optimal inventory model for items with imperfect quality and shortage backordering’, Omega, vol. 35, no. 1, pp. 7–11, 2007, doi: https://doi.org/10.1016/j.omega.2005.01.019.

M. Y. Jaber, S. K. Goyal, and M. Imran, ‘Economic production quantity model for items with imperfect quality subject to learning effects’, Int. J. Prod. Econ., vol. 115, no. 1, pp. 143–150, 2008, doi: https://doi.org/10.1016/j.ijpe.2008.05.007.

A. Mukhopadhyay and A. Goswami, ‘Economic production quantity (EPQ) model for three type imperfect items with rework and learning in setup’, An Int. J. Optim. Control Theor. Appl., vol. 4, no. 1, pp. 57–65, 2014, doi: https://doi.org/10.11121/ijocta.01.2014.00170.

D. A. Schrady, ‘A deterministic inventory model for reparable items’, Nav. Res. Logist. Q., vol. 14, no. 3, pp. 391–398, Jan. 1967, doi: https://doi.org/10.1002/nav.3800140310.

N. Li, F. T. S. Chan, S. H. Chung, and A. H. Tai, ‘An EPQ Model for Deteriorating Production System and Items with Rework’, Math. Probl. Eng., vol. 2015, p. 957970, 2015, doi: https://doi.org/10.1155/2015/957970.

B. Sarkar, L. E. Cárdenas-Barrón, M. Sarkar, and M. L. Singgih, ‘An economic production quantity model with random defective rate, rework process and backorders for a single stage production system’, J. Manuf. Syst., vol. 33, no. 3, pp. 423–435, 2014, doi: https://doi.org/10.1016/j.jmsy.2014.02.001.

E. Ebrahimi, B. Shirazi, I. Mahdavi, and A. Arshadi Khamseh, ‘Toward a sustainable economic production quantity model employing triple bottom line strategy: Uncertain multi-objective optimization with lost sales and full back-order’, Sci. Iran., 2022, doi: https://doi.org/10.24200/SCI.2022.59478.6267.

M. Al-Salamah, ‘Economic production quantity in an imperfect manufacturing process with synchronous and asynchronous flexible rework rates’, Oper. Res. Perspect., vol. 6, p. 100103, 2019, doi: https://doi.org/10.1016/j.orp.2019.100103.

M. Sanjai and S. Periyasamy, ‘An inventory model for imperfect production system with rework and shortages’, Int. J. Oper. Res., vol. 34, no. 1, pp. 66–84, Dec. 2018, doi: https://doi.org/10.1504/IJOR.2019.096939.

A. Guha and D. Bose, ‘A note on “Economic production quantity in batch manufacturing with imperfect quality, imperfect inspection, and destructive and non-destructive acceptance sampling in a two-tier marketâ€â€™, Comput. Ind. Eng., vol. 146, p. 106609, 2020, doi: https://doi.org/10.1016/j.cie.2020.106609.

A. I. Malik and B. Sarkar, ‘Disruption management in a constrained multi-product imperfect production system’, J. Manuf. Syst., vol. 56, pp. 227–240, 2020, doi: https://doi.org/10.1016/j.jmsy.2020.05.015.

D. Castellano and C. H. Glock, ‘Economic production quantity with inventory rationing for a decaying item’, IFAC-PapersOnLine, vol. 55, no. 10, pp. 2998–3003, 2022, doi: https://doi.org/10.1016/j.ifacol.2022.10.188.

N. Karagül and A. Eroğlu, ‘Production lot sizing with quality screening, rework and shortages backordered TT - Kalite kontrol, tamir ve sonradan karşılama ile üretim parti büyüklüklerinin belirlenmesi’, Pamukkale Üniversitesi Mühendislik Bilim. Derg., vol. 28, no. 4, pp. 604–612, 2022, [Online]. Available: https://dergipark.org.tr/en/download/article-file/2624083.

S. Priyan, P. Mala, and M. Palanivel, ‘A cleaner EPQ inventory model involving synchronous and asynchronous rework process with green technology investment’, Clean. Logist. Supply Chain, vol. 4, p. 100056, 2022, doi: https://doi.org/10.1016/j.clscn.2022.100056.

Downloads

Published

2024-06-04

How to Cite

[1]
C. . Aprilianti, A. K. Garside, A. . Khoidir, and T. E. . Saputro, “Economic production quantity model with defective items, imperfect rework process, and lost sales”, j. sist. manaj. ind., vol. 8, no. 1, pp. 35–46, Jun. 2024.

Issue

Section

Research Article

Most read articles by the same author(s)