Analisis Prosedur Perawatan Mesin Motorizer Sedimen di PDAM Tirta Pakuan Kota Bogor

Authors

  • Rio Nurman Gumilar Politeknik APP Jakarta
  • M Tirtana Siregar Politeknik APP Jakarta

DOI:

https://doi.org/10.30656/jsmi.v1i2.263

Keywords:

Machine Treatment, Motorizer Machine, Work Procedure

Abstract

This research have objective to determine the application of procedures, mismatches work processes and maintenance of machinery repair and analyze the causes of motor engine damage in the PDAM Tirta Pakuan Bogor City. The data used in this research are primary and secondary data. Primary data obtained through observations and interviews to the parties concerned in the mechanical and electrical parts. Secondary data in the form of data SOP maintenance and repair machine from company. Descriptive, comprative, and evaluative methods are used to analyze the actual condition and working procedures of maintenance and repair of machinery and to compare between the results obtained from this research on the implementation of the maintenance work process and the repair of machines there are still stages that are not executed according to the procedure. Using the Fishbone Diagram method, the most dominant type of damage occurring in the motorizer engine is a burning roll with a contribution rate of 53.125%. Using Pareto Diagram, this analysis can provide information for the company to pay more attention to the maintenance and repair activities of the machine so that the work process activities in the mechanical and electrical section run well and smoothly.

Downloads

Download data is not yet available.

References

Alwi, R. (2016). Reliability Centered Maintenance dalam Perawatan FO Service Pump Sistem Bahan Bakar Kapal Ikan. Jurnal Riset Teknologi Kelautan, 14(1), 77–86.

Asmoko, H. (2013). Teknik Ilustrasi Masalah-Fishbone Diagrams. Magelang: Badan Pendidikan Dan Pelatihan Keuangan Departemen Keuangan.

Bachtiar, D. P., Leksananto, K., & Helianty, Y. (2015). Penjadwalan Perawatan Preventive pada Mesin Slotting DI CV. Cahaya Abadi Teknik. REKA INTEGRA, 3(4), 296–307.

Hakim, L., & Fahrizal. (2014). Penerapan RCM pada Sistem Distribusi Air di PDAM Pasir Putih Pematangan Barangan Kabupaten Rokan Hulu. Jurnal Aptek, 4(2), 129–140.

Hariady, S. (2014). Analisa Kerusakan Pompa Sentrifugal 53-101C WTU Sungai Gerong PT. Pertamina RU III Plaju. Jurnal Desiminasi Teknologi, 2(1), 29–42.

Kuntadi, A. (2013). Perencanaan Sistem Perawatan Mesin Rotary Lobe Pump Melalui Reliability Centered Maintenance (RCM) (Studi Kasus PT. Lombok Gandaria). Jurusan Teknik Industri, Fakultas Teknik, Universitas Muhammadiyah Surakarta.

Kurniawan, F., (2013), Manajemen Perawatan Industri, Graha Ilmu, Yogyakarta

Setiawan, A., & Witantyo, W. (2016). Analisa Kegagalan Poros Pompa Centrifugal Multistage (GA101A) Sub Unit Sintesa Urea PT. Petrokimia Gresik. Jurnal Teknik ITS, 5(2), 667–672.

Downloads

Published

2017-12-31

How to Cite

[1]
R. N. Gumilar and M. T. Siregar, “Analisis Prosedur Perawatan Mesin Motorizer Sedimen di PDAM Tirta Pakuan Kota Bogor”, j. sist. manaj. ind., vol. 1, no. 2, pp. 55–60, Dec. 2017.

Issue

Section

Articles