Usulan Penerapan Total Productive Maintenance pada Transfer Conveyor 17A

Authors

  • Sahrupi Sahrupi Universitas Serang Raya
  • Juriantoro Juriantoro Universitas Serang Raya

DOI:

https://doi.org/10.30656/jsmi.v2i1.568

Keywords:

Maintenance, Overall Equipment Effectivenes, Transfer Conveyor 17A

Abstract

The quantity and quality of coal affects the efficiency of the generating unit, therefore the utilization of Transfer Conveyor 17A is very necessary to fulfill the fuel requirement (coal) of PT Indonesia Power Unit Generation Unit Suralaya. Transfer conveyor is an additional element in a conveyor belt circuit that serves to channel coal from unloading area until coal bunker (power plant). This study aims to find out the value of OEE Transfer Conveyor 17A which is used as the basis of proposed improvement based on the lowest value of the three parameters in OEE. The concept of research adopting OEE method with the value of quality is assumed 97,50% because the equipment that becomes the object of research does not produce the product. The result of calculation obtained by OEE value equal to 82,98% with ratio Availability 86,76% Performance Eficiency 98,09% and Rate of Quality 97,50%. A planned maintenance action is required to avoid unpredictable engine damage such as the operator checking the machine before it is operated, providing periodic training to operators and maintenance to improve their capabilities.

References

S. Nakajima, TPM: Introduction to Total Productive Maintenance. Cambridge: Productivity Press, 1988.

E. Rimawan and A. Raif, “Analisis Pengukuran Nilai Overall Equipment Effectiveness (OEE) pada Proses Packaging di Line 2 (Studi Kasus PT. Multi Bintang Indonesia. Tbk),” Sinergi J. Tek. Mercu Buana, vol. 20, no. 2, pp. 140–148, 2016.

S. Supriyadi, G. Ramayanti, and R. Afriansyah, “Analisis Total Productive Maintenance Dengan Metode Overall Equipment Effectiveness dan Fuzzy Failure Mode and Effects Analysis,” Sinergi J. Tek. Mercu Buana, vol. 21, no. 3, pp. 165–172, 2017.

H. Sun, R. Yam, and N. G. Wai-Keung, “The implementation and evaluation of Total Productive Maintenance (TPM)—an action case study in a Hong Kong manufacturing company,” Int. J. Adv. Manuf. Technol., vol. 22, no. 3–4, pp. 224–228, 2003.

I. P. S. Ahuja and J. S. Khamba, “Total productive maintenance: literature review and directions,” Int. J. Qual. Reliab. Manag., vol. 25, no. 7, pp. 709–756,

R. M. Jannah, S. Supriyadi, and A. Nalhadi, “Analisis Efektivitas pada Mesin Centrifugal dengan Menggunakan Metode Overall Equipment Effectiveness (OEE),” in Prosiding Seminar Nasional Riset Terapan| SENASSET, 2017, pp. 170–175.

A. R. Widya, “Analisis Penerapan Overall Equipment Effectiveness Pada Mesin Power Press Combination Forming 60T,” J. Sist. dan Manaj. Ind., vol. 1, no. 2, pp. 99–107, 2017.

J. Arturo Garza-Reyes, S. Eldridge, K. D. Barber, and H. Soriano-Meier, “Overall Equipment Effectiveness (OEE) and Process Capability (PC) Measures: a Relationship Analysis,” Int. J. Qual. Reliab. Manag., vol. 27, no. 1, pp. 48–62, 2010.

R. Ramlan, Y. Ngadiman, S. S. Omar, and A. M. Yassin, “Quantification of machine performance through overall equipment effectiveness,” in Technology Management and Emerging Technologies (ISTMET), 2015 International Symposium on, 2015, pp. 407–411.

B. Dal, P. Tugwell, and R. Greatbanks, “Overall equipment effectiveness as a measure of operational improvement–a practical analysis,” Int. J. Oper. Prod. Manag., vol. 20, no. 12, pp. 1488–1502, 2000.

S. H. Huang, J. P. Dismukes, J. Shi, and Q. Su, “Manufacturing system modeling for productivity improvement,” J. Manuf. Syst., vol. 21, no. 4, p. 249, 2002.

B. S. Blanchard, “An enhanced approach for implementing total productive maintenance in the manufacturing environment,” J. Qual. Maint. Eng., vol. 3, no. 2, pp. 69–80, 1997.

F. Zammori, M. Braglia, and M. Frosolini, “Stochastic Overall Equipment Effectiveness,” Int. J. Prod. Res., vol. 49, no. 21, pp. 6469–6490, 2011.

S. Sunaryo and E. A. Nugroho, “Kalkulasi Overall Equipment Effectiveness (OEE) untuk Mengetahui Efektivitas Mesin Komatzu 80t (Studi Kasus Pada PT. Yogya Presisi Tehnikatama Industri),” J. Teknoin, vol. 21, no. 4, pp. 225–233, 2016.

Downloads

Published

2018-07-27

Issue

Section

Articles

How to Cite

[1]
“Usulan Penerapan Total Productive Maintenance pada Transfer Conveyor 17A”, j. sist. manaj. ind., vol. 2, no. 1, pp. 51–57, Jul. 2018, doi: 10.30656/jsmi.v2i1.568.