[1]
S. Miranda and W. Tripiawan, “Perbandingan Penentuan Waktu Baku Menggunakan Metode Time Study dan Critical Path Method (CPM)”, j. sist. manaj. ind., vol. 3, no. 1, pp. 19–30, Jul. 2019.