1.
Aprilianti C, Garside AK, Khoidir A, Saputro TE. Economic production quantity model with defective items, imperfect rework process, and lost sales.
j. sist. manaj. ind.
2024;8(1):35-46. doi:
10.30656/jsmi.v8i1.7580