(1)
Nwanya, S. C.; Achebe, C. N. Balancing a Multistage Vehicle Number Plate Production Line Using Effective Cycle Time Model.
j. sist. manaj. ind.
2020
,
4
(1), 1-12.
https://doi.org/10.30656/jsmi.v4i1.2118
.