[1]
Aprilianti, C. et al. 2024. Economic production quantity model with defective items, imperfect rework process, and lost sales.
Jurnal Sistem dan Manajemen Industri
. 8, 1 (Jun. 2024), 35–46. DOI:
https://doi.org/10.30656/jsmi.v8i1.7580
.