[1]
Nwanya, S.C. and Achebe, C.N. 2020. Balancing a multistage vehicle number plate production line using effective cycle time model.
Jurnal Sistem dan Manajemen Industri
. 4, 1 (Jul. 2020), 1–12. DOI:
https://doi.org/10.30656/jsmi.v4i1.2118
.